Kitchen Renovations of Desoto Central Middle, Horn Lake Elementary & Horn Lake Intermediate. PRE-BID IS MAY 2 @ 3:30 STARTING AT HORN LAKE ELEMENTARY - NON MANDATORY Planholders Wagner Genera...
A new 4-Room Addition to the existing School TDL has been awarded the contract...
With a growing number of new students each year, NWCC planned a new 160-student dormitory for the Senatobia Campus. Each dormitory unit houses four students who have their own kitchen, washer/dryer, ...
This facility is designed to be a working training center for those entering the pre-school and day-care professions. The day-care facilities include day-care facilities for faculty children, and als...
The Project consists of the exterior renovations of the Technical Education #2 building on the Senatobia Campus of Northwest Mississippi Community College. Pre-Bid Meeting July 17, 2014 @ 10...
AERC provided Integrated Building Analysis using our Flir T-300 infrared camera and comprehensive building analysis system, including cost-to-benefit evaluations and documentation/scheduling using Bui...
This new building for Grades 3 through 6 includes educational space, library, computer labs. The cafeteria, music and PE spaces can all be opened up to create one large space for school programs and ...
The Tishomingo County School District is using ARRA Funds to build several new Additions and Renovations on several campus locations. These include: A New Band Hall / Auditorium at the Burnsville Ca...
In addition to the usual functional requirements of a professional office space, such as offices, conference room, print room, break area, etc., this